Emergency Response Plan for Commercial Buildings in Slovenia

By , owner and licensed real estate agent

Published

Evacuation plan beside an office fire door

An emergency response plan is the written set of steps that tells everyone in a building what to do in the first minutes of an emergency, who decides, and who calls whom. In Slovenia, for a commercial building, the plan sits on top of a legal base: the fire safety rules (požarni red), and where thresholds are met, a fire plan and an evacuation plan. Owners and tenants share the duty, so the cleanest approach is to settle who does what before anything happens. We manage commercial property in Slovenia, and that is the angle of this guide: a plan that works for the building, the lease and the people inside it.

HOOF
Manage Commercial Property With Care
HOOF provides commercial property management and advice for owners and tenants seeking a thoughtful approach to their buildings.
Commercial spaces in Slovenia

TL;DR

  • An emergency response plan covers what to do once an emergency starts. An emergency preparedness plan covers the measures taken beforehand. A commercial building needs both.
  • Under the Pravilnik o požarnem redu, a fire plan and an evacuation plan are required for buildings with at least medium fire hazard or more than 100 people present at once.
  • Where an evacuation plan is required, a practical evacuation drill is required at least once a year, with a written record.
  • Name responsible persons per shift, keep exits free, post the evacuation plan, and log inspections and training.
  • Decide in the lease and the management contract who prepares, pays for and updates each document.

Table of Contents

Response plan or preparedness plan: what is the difference?

The two terms are often used as if they were one. A preparedness plan covers the measures and practices an organization puts in place in advance, while a response plan is the set of steps that guides management once an emergency arises. Think of preparedness as maintained extinguishers, trained staff, clear corridors and tested alarms. Think of response as the card on the wall that says who raises the alarm, where people gather and who meets the fire brigade.

A response plan also has a practical limit. A chapter on contingency planning in a security textbook describes the plan as documenting the preparation done, setting ground rules for response and assigning responsibilities, and warns that an overly burdensome plan can hamper incident management. For a multi-tenant office building or a warehouse, that means short, role-based instructions rather than a 60-page binder nobody opens.

Response plan or preparedness plan: what is the difference?

What Slovenian rules require

The core instrument is the Pravilnik o požarnem redu, the fire safety regulation. It applies to owners or users of buildings and sets out the following documents.

DocumentWhen it is requiredWhat it contains
Fire rules (požarni red)Buildings that must have them under the regulationNine elements, from fire-safety organization and prevention measures to instructions for acting in a fire and training
Fire plan (požarni načrt)At least medium fire hazard, more than 100 people at once, or a solar power plant connected to the public gridFire-safety layout of the building
Evacuation plan (načrt evakuacije)At least medium fire hazard or more than 100 people at onceA graphic of the building with routes, assembly point and equipment

The thresholds come from Article 2 as summarized by a fire-safety consultancy, which also notes that the fire rules, fire plan, evacuation plan and posted annexes must be signed by the owner, the user or an authorized person.

The nine elements of the fire rules are, in short:

  1. fire-safety organization, with the tasks and responsibilities of employees or residents;
  2. fire-prevention measures, such as smoking bans and rules for open flames;
  3. removal of unnecessary combustible material;
  4. the expected number of users;
  5. measures against explosion, flammable waste, and electrical and gas hazards;
  6. measures for safe evacuation and rapid intervention;
  7. other preventive and active measures, with methods of control;
  8. instructions for acting in a fire, including which services to notify and what to do afterward;
  9. the types and methods of training for employees or residents.

What changed recently

The Ministry of Natural Resources and Spatial Planning issued the fifth edition of Technical Guideline TSG-1-001:2026 on fire safety in buildings on 9 October 2026, replacing the 2019 edition. It covers structural fire resistance, fire compartments, evacuation routes, alarm and detection systems, extinguishing equipment and firefighter access. It is a design guideline for buildings, so it matters most when you build, renovate or change how a space is used. If you are planning that kind of work, our guide to change of use for business premises explains how the permitting side fits together. Check the official page for the current text before relying on any detail.

How to build the plan, step by step

The process below follows the logic of Ready.gov's business guidance, a US source, which starts with a risk assessment. Slovenian legal duties are layered on top.

Step 1: Assess what can happen in this building

List the hazards that are realistic for the site: fire, flooding, power or gas failure, earthquake, a hazardous-substance release from a neighboring unit, a threat to people. A hospitality unit with a kitchen and a warehouse with racking and forklifts have different fire loads from a small office. Record also the expected number of people at peak times, because the 100-person threshold counts everyone who can be present at once, including customers and visitors.

Step 2: Document your resources

Note what you have to stabilize an incident: extinguishers, hydrants, alarm and detection systems, first-aid kits, emergency lighting, and the people trained to use them. Also note outside resources, such as the fire brigade's access route and the nearest assembly area.

Step 3: Define the protective action for each hazard

For each hazard decide the right action: evacuate, shelter, or stay put and wait for rescuers. A fire in the stairwell may mean staying in a room, while a fire on your own floor means leaving. Write that down as a short instruction for each scenario.

Step 4: Assign responsibilities

The regulation sets numbers. An employer with up to 300 workers per shift must name in the fire rules a person responsible for fighting initial fires and carrying out evacuation for each shift and work location, plus one more person for every further 300 workers. Where an evacuation plan and fire plan are required, there must be one responsible person per shift regardless of headcount, plus one more for every 200 people in the building. The same article states that the owner or user, or an authorized person, prepares the documents, and that an authorized preparer must meet the training conditions in the relevant regulations.

Step 5: Plan alerts and communication

Decide how occupants are warned, who calls 112, how you reach management and staff during and after the event, and how tenants in a shared building reach each other. Keep one current contact list: building manager, owner, each tenant's responsible person, maintenance contractor, alarm monitoring center, utility emergency lines.

Step 6: Sign, post, train, and review

Sign the documents, post the evacuation plans, brief everyone and schedule the drill. Then set a review trigger: any change in layout, tenant mix, occupancy or use.

Building emergency procedures the plan should cover

Evacuation

The evacuation plan must be a graphic depiction of the building showing each room or location, the evacuation route, the assembly point, extinguishing equipment and the manual fire alarm call points. It must be posted in every room or space where people gather or are present according to the building's use. The same regulation requires that evacuation routes and emergency exits are always free and passable. A fire-safety-relevant element of a route may not be changed unless there is a new building permit or a professional assessment by a responsible designer proving fire safety is not reduced. In practice, that rules out storing pallets in a corridor or locking a fire door overnight, and it matters when a tenant fits out a unit.

Alarm and calling for help

Spell out who raises the alarm, who calls 112, and who meets the fire brigade and shows access. The national civil protection agency's leaflet for multi-apartment buildings tells occupants to call 112 and warn others if possible. It also gives basic door behavior that translates well to offices: check the corridor, test the door with the back of the hand before opening, and close doors behind you to slow the spread of fire.

Stay or leave

Evacuation is not always right. The same leaflet notes that annual evacuation training teaches when evacuation is the right measure and when it is better to stay and wait for rescuers. Your plan should say which situations call for which, per floor and per unit.

First aid and people who need assistance

Name who holds the first-aid kit, where it is, and who trained. Plan for visitors, customers and people who need help to leave, such as someone using a wheelchair on an upper floor. A guide on emergency response procedures lists these elements: raising the alarm, who summons emergency services, escape routes, assembly points, access for emergency services, staff responsibilities, a roll-call method, liaison with neighbors, and provision for people needing assistance.

Which emergencies to prepare for

Fire is the one the regulation is built around, but Slovenia plans for more. The government publishes hazard assessments for earthquakes, wildfires, floods, nuclear and radiological accidents, infectious diseases, rail and aviation accidents, dangerous-substance accidents and terrorism, and such assessments also exist for companies and organizations. The national protection and rescue plans are based on a hazard assessment and cover alarm, command, and protective measures, and the government publishes recommendations on evacuation and sheltering.

For a commercial building, a sensible way to scale this:

  • Fire: full procedure, as legally required.
  • Flood and storm damage: water shut-off locations, protection of ground-floor stock and server rooms, contractor numbers.
  • Earthquake: where to take cover, how to check for damage before re-entering.
  • Power, gas or water failure: who shuts off what, and when to close the premises.
  • Hazardous substances nearby: when to shelter indoors and how to close ventilation.

One page per scenario is enough. Match the response to the building: a warehouse with stored goods differs from a restaurant, and a shop with the public inside differs from a closed office.

Emergency response checklist for owners, managers and tenants

Built from the regulation's requirements, the following list works as a working checklist.

Documents

  • Fire rules with all nine elements, signed by the owner, user or authorized person.
  • Fire plan and evacuation plan where the thresholds are met.
  • Evacuation plans posted in every space where people gather.

Physical readiness

  • Evacuation routes and emergency exits free and passable at all times.
  • Extinguishers, hydrants and alarm points in place and marked on the plan.
  • Firefighter access areas unobstructed.

People

  • Responsible person named for every shift and work location, with the extra persons the headcount requires.
  • Every employee familiar with the fire rules.
  • Current contact list distributed.

Controls and records

  • Control inspections of fire equipment, active fire-protection systems and the application of measures, with the method and frequency set by the owner or user and recorded on the Annex 2 form of the regulation.
  • Records of equipment maintenance and employee training.
  • Annual practical evacuation training, with time, participants and method recorded.

Drills, training and keeping the plan current

Where an evacuation plan is required, Article 11 requires at least one practical evacuation training every year, recorded with its time, participants and method. The fire rules must also be adapted to any change in the building that affects fire safety, and employers must make sure all employees know them. That includes new hires and temporary staff.

A drill is only useful if you measure it. One Slovenian manufacturer describes its annual drill involving employees, students, contractors and visitors, where the response to the alarm signal at the monitoring center is checked, evacuation time is measured and staff knowledge of routes is assessed, with results compared year on year. You can borrow that structure: time the evacuation, count heads at the assembly point, note what blocked people, fix it, and file the record.

Occupants gather after an evacuation drill

In a multi-tenant building, run the drill for the whole building on a single date and invite every tenant's responsible person. Update the plan whenever a tenant moves in or out, walls move or a unit changes use, and every time a drill exposes a gap.

Who is responsible: owner, tenant or manager

The regulation speaks of the owner or user, so in a leased commercial space both can carry duties. Settle it in writing. The lease should say who prepares and signs the fire rules and plans for the unit and for the common areas, who pays for inspections and drills, and what the tenant may change in fit-out without a new assessment. Our guide to commercial lease negotiation in Slovenia covers where these clauses belong in the negotiation.

The regulation allows an authorized person to act, for example a building manager in multi-apartment buildings, and the national agency's leaflet lists that manager's tasks: preparing the fire rules and plans, organizing the annual drill, keeping routes clear, maintaining extinguishers and the hydrant network, inspecting heating and flue systems and ensuring a fire watch during hot work. Owners of commercial buildings can organize the same duties through a management contract. Read our owner's guide to commercial property management for how that division of work usually looks, and our preventive maintenance plan for the inspection routine that supports it.

Property management for owners who want this off their desk

Owners with one building and a handful of tenants can keep a plan alive on a spreadsheet. Owners with several properties, mixed office, retail, warehouse and hospitality space, usually need one accountable party who keeps the calendar of inspections, drills and updates. HOOF offers commercial property management in Slovenia, and the same team also handles leasing and tenant representation, so lease terms and building duties are looked at together.

HOOF

If you are looking for premises, our tenant representation service covers the search through to lease signing, a good moment to ask what emergency documents a building already has.

Our perspective

A plan is only as good as the person who keeps it alive. In our work with commercial buildings in Slovenia, the paperwork is rarely the hard part. The hard part is continuity: the tenant who changed the layout, the new employee nobody briefed, the exit that became a storage corner.

That is why we think about emergency planning as part of managing the property, not as a one-off document. A boutique, personal approach means one team that knows the building, its owner and its tenants, and stays involved from the first analysis through to the day-to-day running.

For owners, our advice is simple: decide who is responsible, write it into the lease and the management contract, and put the inspection and drill dates in a calendar somebody owns. We offer property management for exactly this kind of long-term accountability.

Maruša

FAQ

Does every commercial building in Slovenia need an evacuation plan?

No, it depends on the thresholds. An evacuation plan and a fire plan are required for buildings with at least medium fire hazard or where more than 100 people can be present at once, according to Article 2 of the regulation. Fire rules are required more widely. Confirm which applies to your building with a qualified fire-safety professional.

How often must we run an evacuation drill?

At least once a year where an evacuation plan is required, as Article 11 sets out. Keep a record of the time, the participants and the method. Run an extra drill after a significant change in layout or occupancy.

Who signs and prepares the plans?

The owner or user prepares the fire rules, fire plan and evacuation plan, or an authorized person does. An authorized preparer must meet the training conditions set by regulation. The documents are signed by the owner, user or authorized person.

What is the difference between an emergency response plan and a checklist?

The plan is the full document: roles, procedures, contacts and scenarios. The checklist is the short list you use to verify the plan is in place and working, for example that exits are clear, inspections are logged and training is recorded.

Sources

Maruša Gostiša

Need advice on a commercial property?

Maruša knows the Slovenian commercial property market first hand. Call her for a free consultation about your specific situation — in English.

Maruša Gostiša, licensed real estate agent

Read our Google reviews